Defect localization
Prevention of defect development
Repair without shutting down the line
Safe elimination of the defect
Installation of temporary repair spring clips on the overhead line wire.
Installation of a rotary repair sleeve on an adhesive base for defects on a wire no longer than 100 mm.
Installation of a spring-loaded shunt clamp for defects on a wire up to 500 mm long.
Installing or Removing Short Circuit Indicators.
Defect localization
Prevention of defect development
Repair without shutting down the line
Safe elimination of the defect
- Identifying the location of the defect
- Installation of clamps and couplings in the places of unbraiding of the conductors on the switched on
line
Small wire defects
Local wire repair
Repair of power lines,
the disconnection of which is impractical